Winter North Atlantic

Discuss how the naval architect in the modern era can verify the ships design as being fit for purpose.

Consider an oil tanker of 180m LOA, built in 2020, which is loading from the ballast condition to the fully loaded condition, in an area of still water and moored to a quay. The vessel then undertakes a transatlantic voyage from Stockholm to Jacksonville (USA), in the Winter North Atlantic (WNA) area during which time […]

Scroll to top