Week 2: Time/Schedule, Cost, Quality
Choose any two:
Time/schedule
Cost
Quality
In project management, you will read about and experience what is often referred to as the “triple constraint triangle.” We introduced it in an earlier lesson in NR631.
The idea is that, with any project, you can really only achieve two sides of the triangle. Share your thoughts on that concept and then share which side of the triangle poses the greatest threat of constraint for your project.
Share your thoughts on that concept and then share which side of the triangle poses the greatest threat of constraint for your project.