Prepare a Bid Tab using the deliverable for Bid Tab & Sub Selection template that is provided. Do this for each Scope of Work

Estimating and Bidding

Overview

You are working for a General Contractor and will be bidding on a Fresh-and-Easy project.

You have been given the responsibility for the following scopes of work (SOWs):

Aluminum Storefront (Div 08411 Aluminum Doors, Frames, and Windows)

Interior and Exterior Paint (Div 09911 Painting)

Files to use for this Assignment

The following files are posted to Blackboard:

1 – Bid Day Instructions (Part 1 Bid Tab Prep)

2 – Drawings

3 – Specifications

4 – Selected Glazing Bids

5 – Selected Painting Bids

6 – Master Bid EXAMPLE (note: this is the real master bid for the Fresh-and-Easy project)

7 – Bid Tab EXAMPLES (note: these are real examples from bid day)

8 – DELIVERABLE for Bid Tab & Sub Selection

DELIVERABLE for Bid Tab & Sub Selection

Prepare a Bid Tab using the deliverable for Bid Tab & Sub Selection template that is provided. Do this for each Scope of Work:

1 Bid Tab for Aluminum Storefront (Div 08411Aluminum Doors, Frames & Windows)

1 Bid Tab for Interior and Exterior Paint (Div 09911 Painting)

You are responsible for the yellow highlighted cells (columns G, I, J, K, L) for each SOW:

Description (column G) should be an organized, full breakout of the individual items included within each Scope of Work

The quantity and unit (columns I and J) should be your QTOs

The unit price (column K) should be based on the GC’s historic cost database

The total (column L) should be provided on a line-by-line basis

Assume you pulled the following from your historic cost database as a GC:

Aluminum Storefront System with 1” insulated glass: $24.10/sf (clear finish)

Aluminum Storefront Anodized Finish: Add 15% (if applicable)

Aluminum Doors: $466 each

Interior Painted Surfaces: $0.55/sf (historic average for all kinds of interior surfaces)

Exterior Painted Surfaces: $1.42/sf (historic average for all kinds of exterior surfaces)

You are also responsible for filling in the Scope column for each Subcontractor Bid

Prepare a detailed breakdown of each sub’s bid in Columns O (and beyond… as many columns as subcontractor bids)

Also provide a brief explanation of why you chose the specific subs for each Scope of Work.  Provide 1-2 paragraphs maximum per sub (bullet points are fine).  This can be on a separate Word document or at the bottom of each SOW’s bid tab.

Prepare a Bid Tab using the deliverable for Bid Tab & Sub Selection template that is provided. Do this for each Scope of Work