Supply chain issues during the blockade on Qatar
Prepare a project paper for the “engineering MGMT DESIGN 1 COURSE”.
an outline for the project (one page) is attached to this email.
the Project ( the instruction in the project template { EGRM 4003 Project Template_FA2(1).docx}
six pages.
The Topic of the project would be ( supply chain issues during the blockade on Qatar)
firstly Qatar shipped all goods via plain it was expensive, thank they manage a truck line from Turkey to Iran, and from Iran to Qatar via ships,
another route was ships lines from Oman and Pakistani china route.
Prepare a project paper for the “engineering MGMT DESIGN 1 COURSE”.