THE 2012 OLYMPICS INFRASTRUCTURE
Prepare a critical review of a project and produce a Reflective case study report.
The project to analyze is: The 2012 Olympics Infrastructure, and have to outline with factors contributed to effective project management and which were absent. Make recommendations too.The word limit is 3000, (-/+ 10 %) , with Harvard references.
The report need to have Table of Contents, 20 references from books and academic articles. In the appendix to include a Pestle analysis.
Prepare a critical review of a project and produce a reflective case study report on the 2012 Olympics Infrastructure.